|
Project one or more series of levels
| Component | What the name means |
| Bal | Balance
| | Level | Level with a Start and Finish date
| | FLevels | Series of levels using 'from' dates and levels
| | TLevels | Series of levels to corresponding dates
| | FLevelsGrow | Series of levels from specific dates the level is determined by an initial level and a growth forecast
| | TLevelsGrow | Series of levels to specific dates the level is determined by an initial level and a growth forecast
| | FLevelsFcst | Series of levels from specific dates the level is determined by a forecast
| | TLevelsFcst | Series of levels to specific dates the level is determined by a forecast
| | FLevelsCombine | Combine multiple sets of levels
| | FLevelsThenGrow | Do an FLevels and thereafter grow
| | TLevelsThenGrow | Do a TLevels and thereafter grow
|
Levels is similar to the Stepped Rate From and Stepped Rate To families, except that what is returned is a level at a particular time, not the results of applying a rate over a time period. So the familiar models of functions are present such as Level (whose constant rate equivalent would be Con), FLevels (stepped rate equivalent FStep) etc.
|